Managing projects using the EPS


primavera p6 training in Islamabad

The enterprise project structure (EPS) organizes and summarizes all projects within the enterprise hierarchically for top-down budgeting, resource and cost analysis, and global control of data. Technical Data used in the field explained in primavera p6 training in Islamabad. An enterprise structure enables you to manage multiple projects from the highest levels of the organization to the individuals that perform specific project tasks. You can also use the EPS to define project properties, including dates, budgets, codes, resources, and project defaults.

Use the Project Details tabs in the bottom portion of the Projects window to define project properties and defaults used throughout a project. You can also assign some general properties to the EPS nodes in your hierarchy. Some more details of primavera p6 training in Islamabad are as under.

Display Details by clicking the Display Options bar and selecting Show on Bottom, Project Details, so that the checkmark appears. You can assign a resource distribution curve to any resource or role assignment on activities with a duration type of Fixed Duration and Units/Time or Fixed Duration & Units. Assign the appropriate curve to a resource or role assignment by selecting a curve in the Curve column in the Resource Assignments window. You can also assign a resource curve in the Resources tab in the Activity Details.

Open each tab to view and edit the selected project‘s information. The details include schedule information, project codes, summarization information, default settings such as duration type for new activities, and activity numbering increments. TSK Training for Skills and Knowledge is the best institute in Rawalpindi Islamabad for Pakistani Students who wants to join primavera p6 training in Islamabad.

Featured Review
Tag Cloud
No tags yet.
bottom of page