MATERIALS AND SUPPLIES
- dataentrytsk
- Aug 18, 2016
- 2 min read
Materials and supplies are below and is defined for purposes of estimation, it can be both material when they have to be separated due to the different tax rates.These items, which are recorded in physical and be part of the permanent structure. Technical Data used in the field explained in quantity surveyor courses in Rawalpindi.
These elements, which are used in the design, but are not physically incorporated in the project, such as concrete forms. Prices of materials and accessories are combined pricing of services, the cost of book catalogs, quotations and historical records are obtained. Each office should supply prices, in these publications verify and evaluate the adequacy before use. They considered the standard unit prices from these sources are satisfactory, was taken after a determination of applicability. It should, if this type of cost data to correct certificates for discounts, inflation and other factors, the contractor do costs. Some more details quantity surveyor courses in Rawalpindi are as under.
Quotes from Manufacturers and Suppliers: Appointments must be obtained for all major materials and equipment installed and for items readily available or unspecialized. Quotes can be received either in writing or by phone. It is preferable to get quotes for each project to ensure that the cost of electricity and that the item meets the specifications. If possible, more than one bid must be sought in order to be sure that the prices are competitive. The engineer should try to identify costs and ensure that contractors discounts are calculated in the estimate. Appointments must be kept patented entrusted to preserve confidentiality. A fact sheet phone number shown similar to that shown in Appendix C, Figure C-5 should be used for recording information cited. The cost engineer must also consider the FAR 25.2 construction materials Buy American Act and Section 6.1 FAR full and open competition the specified materials section.
WASTE OF COMPENSATION: Considerations losses and waste can be incorporated into the calculation of unit price of materials. This methodology for calculating the cost of materials leads to a lot of work placement identification has not changed to reflect the loss of material. However, the alternative method to increase the measured amount of amount of waste and loss is acceptable if the excess amount may be used for other purposes. The method-ology is used by the engineer costs, you should not calculate the work of the additional amount. In any case, a statement is used in the estimation required to account for the methodology. TSK Training for Skills and Knowledge is the best institute in Rawalpindi Islamabad for Pakistani Students who wants to join quantity surveyor courses in Rawalpindi.
Comments